Deprecated Southeast False Creek

Location

South shore of False Creek

Vancouver, BC

Canada

Staticmap?center=49.27441289999999, 123.1097245&size=175x175&scale=2&markers=color:red%7csize:small%7c49.27441289999999, 123
Completion Date
upcoming
Project area
32 hectares
Density
7,150 residential units
18,600 m^2 commercial space
5,200+ projected population
Certifications & Awards
Project Team

Summary

Green buildings and infrastructure

  • All public facilities will meet LEED Gold standard
  • All private buildings must meet LEED Silver standard
  • Green roofs as a component of stormwater management
  • Alternative heating systems
  • Carbon-neutral neighbourhood

Traffic Demand Management

  • Low minimum- and maximum-parking standards
  • Required provision of spaces for car co-op (e.g. CAN)
  • Diverse network of pedestrian and bicycle paths
  • End of trip facilities for cyclists
  • All residences within 5 minute walk of transit

Waste Management

  • Composting and recycling required
  • Neighbourhood-based waste utility encouraged

Ecological Landscaping

  • Natural planting emphasized
  • 1/3 of site to be set aside for open space.
  • Waterfront park featuring naturalized waterfront and stormwater detention ponds
  • 2. Heritage building within the context of a renewed streetscape

Responsible parties:

  • City of Vancouver

Tours:

  • Not available

This Post Was imported from the 'Greater Vancouver Green Guide', it's part of the 'Green Guide Portal' to the Green Building Brain

In 1991 Vancouver City Council passed the Southeast False Creek Policy Statement, which envisioned the development of a model sustainable community on the last remaining undeveloped site on False Creek. The former industrial site, situated across from the downtown core, is close to major employment, transportation, and recreation opportunities. The site will also be the location for the 2010 Winter Olympics Athletes Village.

The development of Southeast False Creek has involved the most comprehensive participatory planning process in city history. This process is based on the following guiding principles: implementing sustainability; stewardship of ecosystem health; economic viability and vitality; and social and community health. These principles demonstrate the commitment to all levels of sustainability in Southeast False Creek. Notable features include increased efficiency in waste and energy, the required provision of affordable housing, ample park space, and strategies to manage traffic demand.

One of the most significant aspects of the development is the requirement that all buildings constructed in Southeast False Creek meet LEED standards. Private buildings are required to meet the LEED Silver standard while public buildings are to be held to the even higher standard of LEED Gold.

City Council policy states that Southeast False Creek is to be a carbon-neutral neighbourhood which means even more stringent infrastructure requirements. All three waste streams (recyclables, compostables and other wastes) must be accommodated in buildings. The city is encouraging the provision of a local waste utility to handle all waste on-site. In addition, a district energy system has been proposed to meet local energy needs.

The transportation plan provides alternatives to the car including extensive foot paths, cycle routes, and transit options.

www.city.vancouver.bc.ca/commsvcs/southeast/